FASECBuildings Group

Search
Close this search box.

URUGUAY Port Defense Platform project

This project is detailed, fabricated and inspected fully based on America standard

AWS D1.1 specification with hot galvanized coating over 100 microns.

ARGENTINA Steel Truss bridge

For such an Argentina client’s structural steel truss girder bridge project, the overall girder length is 750 meters, fully preassembled in our workshop for camber inspection. It’s designed based on American standards and fabricated wholly by AWS D1.1 Welding Procedure Specification.

South America CHILE Workshops Project

CHILE Three Piping-truss Copper Workshops Project Max Single-span is 90m.

CHILE 4200M2 2-storey Workshops

CHILE 4200M2 2-storey Workshops With American Standard Design

BOLIVIA Cement Plant

3,655.72 tons in the first phase; 7,200 tons in the secondphase.

BOLIVIA Cement Plant

VENEZUELA Belt Conveyor Project

Was generally contracted by a German Company